- Rural Electrification Project in Cieneguita A Alto Potrero, Besiko District, Ngäbe Buglé Region 12 km of power lines.
- Project at the Technological University of Panama, installation of high voltage poles for undergrounding and relocation of lines.
- Rural Electrification Project in Loma Grande-Pozo Azul Penonomé District, Coclé Province 4 km of power lines.
- Supply of Underground Wiring in Pedestrian Crossing, Los Pueblos.
- Installation of 14 Kilometers of 34KV Ecological Power Line, Los Algarrobos Hydroelectric Power Plant.
- Installation of General and Auxiliary Services infrastructure, Machine House, Los Algarrobos Hydroelectric Plant.
- Supply and installation of Equipotential Mayas for the Estrella, Los Valles and Esti Hydroelectric Plants, AES Panama.
- Supply and Installation of Lightning Rod Systems, Nata and Los Santos plants, NESTLE PANAMA.
- Supply and Installation of medium and low voltage infrastructure and internal wiring, Central Kitchen, MELO Group.
- Conversion of single-phase line to three-phase and transformer bank in water intake, AES Panama.
- Construction of Medium Voltage Connection for Line One, ALPLA PANAMA.
- Construction of Medium Voltage Connection and low voltage wiring for Line Two, ALPLA PANAMA.
- Redistribution of main switches and main distribution boards, Building of the General Comptroller of the Republic of Panama.
- Construction of Syrup Pumping Booth, FEMSA Panama.
- Supply and Installation of 2000 KVA cabinet transformer, medium voltage and secondary wiring, Industrias Lácteas S.A. Blue Star.
- Supply and Installation of Electrical Infrastructure, Supreme Pasta, Pascual Food Products
- Reconditioning of Medium and Low Voltage Connection, Río Abajo Poultry Packing Plant, MELO Group.
- Installation of Syrup equipment, Coca Cola FEMSA.
- Installation of all electrical distribution at the Hard Rock Hotel Panamá.
- Installation of all electrical distribution of the PH Q Tower.
- Installation of the Lighting System, Expansion of the Arraijan-La Chorrera Highway.
- Construction of 34.5KV Hendrix Type Distribution Line (Ecological), ENSA.
- Extension of Medium Voltage Connection, Cervecería del Barú.
- Relocation Works of Medium Voltage Poles and Lines, Expansion of the José Domingo Díaz Road and Tocumen Road.
- Maintenance of Low Voltage Infrastructure, Pacific Area, Panama Canal Panamá.